Annonces de services
Fermetures
There are no closures at this time.
Avis
Barrington library printer is out of order
Barrington Municipal Library’s printer is out of order until further notice. We apologize for the inconvenience.
Weymouth Waterfront Library parking lot access
The driveway to Weymouth Waterfront Library will be blocked by construction on the nearby bridge. This will be in affect as of April 25 and the estimated time for completion of this project is 2-3 months. Below is a map of the alternate entry/exit point. Anyone travelling to the area will need to drive through the pharmacy parking lot to enter the library parking lot. We apologize for any inconvenience during this time.